Complete ship stores for demanding port calls.
Deck, engine, cabin, provision, bonded, safety and operational supplies coordinated against vessel specifications and delivery timing.
Ship chandling
Multi-category supply through one accountable response.
We support routine replenishment, planned procurement and urgent supply requirements. RFQs are reviewed for description, size, grade, maker, certificate requirement, quantity, unit and port-delivery constraints before quotation.
Deck, engine & cabin stores
- Hand tools, power tools and workshop consumables
- Steel plates, angles, pipes and fasteners
- Bearings, seals, gaskets and hoses
- Valves, fittings, clamps and couplings
- Cleaning tools and maintenance consumables
- Cabin, galley and housekeeping supplies
- Electrical consumables and lighting items
- Ropes, wires, shackles and deck accessories
Provisions & fresh stores
Dry provisions, chilled and frozen foods, fresh vegetables, fruits, dairy, meat and seafood can be coordinated according to quantity, quality preference, dietary requirement and vessel schedule.
- Dry and packaged provisions
- Fresh fruits and vegetables
- Chilled and frozen food
- Meat, poultry and seafood
- Dairy products and beverages
- Galley consumables and disposables
Bonded stores
Bonded-store requirements can be reviewed and supplied where legally permitted and subject to customs, port, vessel and local regulatory procedures. Brand and product availability is confirmed at quotation stage.
Life-saving & firefighting equipment
- Life jackets, lifebuoys and accessories
- Liferaft and lifeboat accessories
- Emergency escape breathing devices (EEBD)
- Portable fire extinguishers
- Fire hoses, nozzles and couplings
- Fire blankets, buckets and cabinets
- Breathing apparatus and oxygen equipment
- First-aid and seasickness supplies
Bunker & fresh-water coordination
We coordinate bunker and fresh-water enquiries with available local resources. Product specification, quantity, port, vessel position, delivery mode, ETA/ETD and required documentation must be confirmed before execution.